The wide old workyards along Broadway were built for locomotives, and the lots left behind out there take a lot of snow before anyone calls them clear. Professional Grade Contractors runs those big surfaces in the dark hours, laying out pass after pass, piling the banks in corners where they will not swallow parking spaces or block a sight line. Doorways and walks get opened by hand, then the whole thing is salted so the first shift of the day never thinks twice about the pavement. Big ground, plain standard: down to the surface, edge to edge. Snow plowing and ice control across Schenectady and the surrounding towns.