Sheridan Drive does not stop — plazas, side lots, curb cuts, delivery bays, all of it in use from early to late. Clean Cut 716 keeps that kind of ground in order all twelve months: mowing, string-trimming and edging the strips and medians through summer, cleanups in spring and fall, then plowing, shoveling and ice control once the pavement turns. In January the work is measured in how fast a lot goes from unusable to open. In July it is measured in a straight edge running a hundred feet of curb. Same standard, different weather.