Belleville's park-and-ride lots start filling before daylight, which means the plowing has to be finished in the dark. Petit Landscaping runs those winter nights: blade down across commercial ground, walks cleared all the way to the door, salt worked into the ruts before they set up hard. Streetlight, falling snow, an empty acre of asphalt turning back to black one lane at a time is strange, satisfying work to be good at. By morning nobody gives it a thought, and that is exactly the intention. One storm after another, the lots open on time.